| Ave LME Cash Settlement Grade A Copper Price for previous month | $ 7,283.95 |
| Ave 4pm R/US$ Closing rate for the previous month | R 7.29313 |
| RCP (excluding vat) | R 53,122.79 |
| | |
| Copper Cathode | |
| RCP excluding vat | R 53,122.79 |
| Base Cathode Premium | R 600.26 |
| RCP for Copper Cathode excluding vat | R 53,723.05 |
| Vat @ 14% | R 7,521.23 |
| Copper Cathode price per Tonne (vat inclusive F.O.R. Palabora Mine Site) | R 61,244.28 |
| | |
| Copper Rod 7.90mm | |
| RCP excluding vat | R 53,122.79 |
| Base Conversion Premium for 7.90mm Copper Rod | R 3,116.00 |
| RCP for Copper Rod 7.90mm excluding vat | R 56,238.79 |
| Vat @ 14% | R 7,873.43 |
| Copper Rod (7.90mm) price Per Tonne (vat inclusive F.O.R. Palabora Mine Site) | R 64,112.23 |
| | |
| Copper Rod Other | |
| Copper Rod (10.0mm) price Per Tonne ( vat inclusive F.O.R. Palabora Mine Site) (+R 900 odd size conversion) | R 65,138.23 |
| Copper Rod (14.0mm) price Per Tonne ( vat inclusive F.O.R. Palabora Mine Site) (+R 1100 odd size conversion) | R 65,366.23 |
| Copper Rod (20.0mm) price Per Tonne ( vat inclusive F.O.R. Palabora Mine Site) (+R 2200 odd size conversion) | R 66,620.23 |
| | |
| Selling Price | |
| Three months seller price for copper in US$ | $ 0.00 |
| | Backwardation |
|